The Solar Installation Process: Step by Step

Most solar installations in New Zealand follow the same broad sequence, though timeframes vary by property and franchise.

Step 1: Site Assessment and Consultation

Your local GoFox electrician gets to know your property and your goals from the start. They’ll assess your roof, switchboard and electricity usage, then talk through what you want to achieve with solar.

Step 2: System Design and Proposal

Your installer designs every solar system specifically for your property. They’ll recommend the right system size, panel layout, inverter and battery options, where relevant. You’ll then receive a tailored quotation based on your actual property and goals.

Step 3: Planning and Network Approval

Once you’re ready to proceed, your installer takes care of the planning. For grid-connected systems, they’ll prepare and submit a distributed generation application to your local electricity network operator. This step confirms your system can connect to the grid safely.

Step 4: Professional Installation

Qualified electricians carry out the full installation on-site. All electrical work follows the approved system design and New Zealand’s electrical standards. This is the step where your panels, inverter and any battery physically go in.

Step 5: Inspection, Compliance and Grid Connection

Your installer arranges the required inspection and completes all compliance documentation. They’ll also help coordinate any import or export meter changes with your electricity retailer. This confirms your system is ready to operate safely.

Step 6: Commissioning and Ongoing Support

Once everything’s complete, your installer commissions your system and shows you how to monitor its performance. They’ll answer any questions you have at this stage. GoFox stays your point of contact for ongoing servicing, maintenance and support.

How Long Does the Solar Installation Process Take?

From your first enquiry to switch-on, the solar installation process usually takes two to six weeks. Network approvals and equipment availability tend to cause the biggest delays. A straightforward residential job with no approval delays can move much faster.

A registered local electrician can give you a realistic timeframe based on your property and franchise area. Find out more on our Solar Power service page or browse our full range of electrical services.

Common Questions About Installing Solar

Do I need to be home during the installation? It helps, especially on the first day when your installer needs access to your switchboard. Once the system’s underway, you don’t need to be there for every step.

Will I lose power during installation? You’ll usually keep power throughout most of the job. There’s typically a short disconnection near the end, while your installer connects everything to your switchboard.

How messy is the installation process? Most of the work happens on your roof, so there’s minimal mess inside your home. Your installer will use drop sheets and tidy up thoroughly once the job’s done.

Do I need approval to connect my solar system to the grid? Yes, most grid-connected systems need a distributed generation application submitted to your local network operator. Your installer takes care of this as part of the planning stage.

What support do I get after installation? GoFox remains your point of contact for ongoing servicing, maintenance and support. If anything comes up with performance or monitoring later on, your local team is on hand to help.

Final Thoughts on Going Solar

The steps from assessment to commissioning are largely the same for most homes. Timeframes shift depending on network approvals, equipment and your installer’s schedule. A clear, upfront conversation with your electrician sets the right expectations from day one.

Local owners run every GoFox franchise, and national buying power keeps our pricing sharp. Over 94% of surveyed customers say they’d recommend us. Our registered, certified electricians handle every step, from your first assessment through to ongoing support. Get in touch with your local GoFox team to start the conversation.

Follow GoFox on Facebook and LinkedIn for more practical advice on solar and electrical work across New Zealand.